MCIMX7D5EVM10SD

Mfr. #: MCIMX7D5EVM10SD
Produttore: NXP Semiconductors
Descrizione: Processors - Application Specialized MCIMX7D5EVM10SD/LFBGA541///TRAY MULTIPLE DP BAKEAB
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: MCIMX7D5EVM10SD Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
MCIMX7D5EVM10SD Overview

This product is manufactured by NXP. The product can operate at a maximum temperature of SMD/SMT. BGA-541 package/case type is utilized by this product. The Industrial Applications for this product. This product's ARM Cortex A7, ARM Cortex M4 is an ARM Cortex M3. This product has a Data Bus Width of 32 bit. The Maximum Clock Frequency of this product is 1 GHz. 1.2 V to 1.25 V operating supply voltage range The minimum operating temperature of this product is - 20 C. The product can operate at a maximum temperature of + 105 C. Tray packaging for easy dispensing This product features DDR3, DDR3L, LPDDR2, LPDDR3 memory type for improved performance and speed. NXP Semiconductors is a trusted brand for quality electronics The Data RAM Size of this product is 256 kB. The Data ROM Size is 96 kB. Interface Type: I2C, JTAG, PCI, SAI, UART Floating Point instruction type supported. Yes regarding Moisture Sensitivity Processors - Application Specialized product type 84 of 100 Processors - Application Specialized as subcategory The product's i.MX is Blue Gecko. This product is also known by the 935352046557 number of 934069005115. 1. 0.032170 oz of Unit Weight

MCIMX7D5EVM10SD Image

MCIMX7D5EVM10SD

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

MCIMX7D5EVM10SD Specifications
  • Manufacturer: NXP
  • Product Category: Processors - Application Specialized
  • RoHS: Y
  • Mounting Style: SMD/SMT
  • Package / Case: BGA-541
  • Series: i.MX 7Dual
  • Application: Industrial Applications
  • Core: ARM Cortex A7, ARM Cortex M4
  • Number of Cores: 3 Core
  • Data Bus Width: 32 bit
  • Maximum Clock Frequency: 1 GHz
  • L1 Cache Instruction Memory: 32 kB, 16 kB
  • L1 Cache Data Memory: 32 kB, 16 kB
  • Operating Supply Voltage: 1.2 V to 1.25 V
  • Minimum Operating Temperature: - 20 C
  • Maximum Operating Temperature: + 105 C
  • Packaging: Tray
  • Memory Type: DDR3, DDR3L, LPDDR2, LPDDR3
  • Brand: NXP Semiconductors
  • Data RAM Size: 256 kB
  • Data ROM Size: 96 kB
  • Interface Type: I2C, JTAG, PCI, SAI, UART
  • Instruction Type: Floating Point
  • L2 Cache Instruction / Data Memory: 512 kB
  • Moisture Sensitive: Yes
  • Processor Series: i.MX 7Dual
  • Product Type: Processors - Application Specialized
  • Factory Pack Quantity: 84
  • Subcategory: Processors - Application Specialized
  • Tradename: i.MX
  • Watchdog Timers: Watchdog Timer
  • Part # Aliases: 935352046557
  • Unit Weight: 0.032170 oz

MCIMX7D5EVM10SD

MCIMX7D5EVM10SD Specifications

MCIMX7D5EVM10SD FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is NXP.

  • A: Is the cutoff frequency of the product Mounting Style?

    Q: Yes, the product's Mounting Style is indeed SMD/SMT

  • A: What is the Package / Case of the product?

    Q: The Package / Case of the product is BGA-541.

  • A: At what frequency does the Application?

    Q: The product Application is Industrial Applications.

  • A: At what frequency does the Core?

    Q: The product Core is ARM Cortex A7, ARM Cortex M4.

  • A: What is the Data Bus Width of the product?

    Q: The Data Bus Width of the product is 32 bit.

  • A: What is the Maximum Clock Frequency of the product?

    Q: The Maximum Clock Frequency of the product is 1 GHz.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 1.2 V to 1.25 V

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 20 C

  • A: Is the cutoff frequency of the product Maximum Operating Temperature?

    Q: Yes, the product's Maximum Operating Temperature is indeed + 105 C

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Tray.

  • A: Is the cutoff frequency of the product Memory Type?

    Q: Yes, the product's Memory Type is indeed DDR3, DDR3L, LPDDR2, LPDDR3

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed NXP Semiconductors

  • A: Is the cutoff frequency of the product Data RAM Size?

    Q: Yes, the product's Data RAM Size is indeed 256 kB

  • A: What is the Data ROM Size of the product?

    Q: The Data ROM Size of the product is 96 kB.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is I2C, JTAG, PCI, SAI, UART.

  • A: What is the Instruction Type of the product?

    Q: The Instruction Type of the product is Floating Point.

  • A: At what frequency does the Moisture Sensitive?

    Q: The product Moisture Sensitive is Yes.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Processors - Application Specialized.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 84.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Processors - Application Specialized

  • A: What is the Tradename of the product?

    Q: The Tradename of the product is i.MX.

  • A: At what frequency does the Part # Aliases?

    Q: The product Part # Aliases is 935352046557.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.032170 oz.

846 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
24,92 USD
24,92 USD
5
24,66 USD
123,30 USD
10
22,98 USD
229,80 USD
25
21,95 USD
548,75 USD
100
19,63 USD
1 963,00 USD
250
18,72 USD
4 680,00 USD
500
17,82 USD
8 910,00 USD
Top