LSF-EVM

Mfr. #: LSF-EVM
Produttore: Texas Instruments
Descrizione: Other Development Tools LSF-EVM
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: LSF-EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LSF-EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Level Translator type. Texas Instruments is a trusted brand for quality electronics 0.95 V to 5.5 V operating supply voltage range Other Development Tools product type 1 of 100 Development Tools as subcategory

LSF-EVM Image

LSF-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LSF-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Other Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Voltage Level Translator
  • Tool Is For Evaluation Of: LSF0101DRYR, LSF0102DCTR, LSF0108PWR, LSF0204PWR
  • Description/Function: Evaluates the LSF family of voltage level translators
  • Brand: Texas Instruments
  • Operating Supply Voltage: 0.95 V to 5.5 V
  • Product Type: Other Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

LSF-EVM

LSF-EVM Specifications

LSF-EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Voltage Level Translator.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 0.95 V to 5.5 V

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Other Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top