LP592201EVM

Mfr. #: LP592201EVM
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools LOW VOTAGE LDO
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: LP592201EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LP592201EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the LDO Voltage Regulators type. 1.85 V to 6 V Input Voltage Output Voltage is 1.8 V Output current: 2 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

LP592201EVM Image

LP592201EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LP592201EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: LDO Voltage Regulators
  • Tool Is For Evaluation Of: LP592201DSC
  • Input Voltage: 1.85 V to 6 V
  • Output Voltage: 1.8 V
  • Output Current: 2 A
  • Series: LP592201
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

LP592201EVM

LP592201EVM Specifications

LP592201EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is LDO Voltage Regulators.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 1.85 V to 6 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 1.8 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 2 A.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

18 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top