LP2951EVM

Mfr. #: LP2951EVM
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools LP2951EVM
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: LP2951EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LP2951EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the LDO Voltage Regulators type. 30 V Input Voltage Output Voltage is 5 V, 1.235 V to 29 V Output current: 100 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

LP2951EVM Image

LP2951EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LP2951EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: LDO Voltage Regulators
  • Tool Is For Evaluation Of: LP2951
  • Input Voltage: 30 V
  • Output Voltage: 5 V, 1.235 V to 29 V
  • Description/Function: Evaluates the LP2951 family of LDOs
  • Output Current: 100 mA
  • Series: LP2951
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

LP2951EVM

LP2951EVM Specifications

LP2951EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is LDO Voltage Regulators.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 30 V

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 5 V, 1.235 V to 29 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 100 mA.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top