LMZ21701EVM

Mfr. #: LMZ21701EVM
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools LMZ21701 Eval Mod Board
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: LMZ21701EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMZ21701EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 5 V to 17 V Input Voltage Output Voltage is 3.3 V Output current: 1 A Texas Instruments is a trusted brand for quality electronics Compatible with LMZ21701. The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SIMPLE SWITCHER is Blue Gecko. 1. 3.479 lbs of Unit Weight

LMZ21701EVM Image

LMZ21701EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMZ21701EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: LMZ21701
  • Input Voltage: 5 V to 17 V
  • Output Voltage: 3.3 V
  • Description/Function: Nano module evaluation board for LMZ21701
  • Output Current: 1 A
  • Series: LMZ21700
  • Brand: Texas Instruments
  • For Use With: LMZ21701
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: SIMPLE SWITCHER
  • Unit Weight: 3.479 lbs

LMZ21701EVM

LMZ21701EVM Specifications

LMZ21701EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Voltage Regulators - Switching Regulators.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 5 V to 17 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 3.3 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 1 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed LMZ21701

  • A: Is the cutoff frequency of the product Maximum Operating Temperature?

    Q: Yes, the product's Maximum Operating Temperature is indeed + 125 C

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Tradename of the product?

    Q: The Tradename of the product is SIMPLE SWITCHER.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 3.479 lbs.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top