LMX2582EVM

Mfr. #: LMX2582EVM
Produttore: Texas Instruments
Descrizione: RF Development Tools LMX2582EVM
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: LMX2582EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMX2582EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the RF Synthesizers type. Frequency range: 5 MHz to 1.4 GHz 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics RF Development Tools product type 1 of 100 Development Tools as subcategory The product's PLLATINUM is Blue Gecko. 1. 0.499120 oz of Unit Weight

LMX2582EVM Image

LMX2582EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMX2582EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: RF Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: RF Synthesizers
  • Tool Is For Evaluation Of: LMX2582
  • Frequency: 5 MHz to 1.4 GHz
  • Operating Supply Voltage: 3.3 V
  • Series: LMX2582
  • Brand: Texas Instruments
  • Product Type: RF Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: PLLATINUM
  • Unit Weight: 0.499120 oz

LMX2582EVM

LMX2582EVM Specifications

LMX2582EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is RF Synthesizers.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 5 MHz to 1.4 GHz.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 3.3 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is RF Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Tradename?

    Q: The product Tradename is PLLATINUM.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.499120 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top