INA4180-4181EVM

Mfr. #: INA4180-4181EVM
Produttore: Texas Instruments
Descrizione: Amplifier IC Development Tools EVM FOR INA418X FAMILY
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: INA4180-4181EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
INA4180-4181EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Current Sense type. 2.7 V to 5.5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Amplifier IC Development Tools product type 1 of 100 Development Tools as subcategory

INA4180-4181EVM Image

INA4180-4181EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

INA4180-4181EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Amplifier IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Current Sense
  • Tool Is For Evaluation Of: INA4180A1, INA4180A2, INA4180A3, INA4180A4, INA4181A1, INA4181A2, INA4181A3, INA4181A4
  • Operating Supply Voltage: 2.7 V to 5.5 V
  • Brand: Texas Instruments
  • Product Type: Amplifier IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

INA4180-4181EVM

INA4180-4181EVM Specifications

INA4180-4181EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Current Sense.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 2.7 V to 5.5 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Amplifier IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

17 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top