HDC2080EVM

Mfr. #: HDC2080EVM
Produttore: Texas Instruments
Descrizione: Multiple Function Sensor Development Tools HDC2080EVM
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: HDC2080EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
HDC2080EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Humidity, Temperature Sensor type. 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Multiple Function Sensor Development Tools product type 1 of 100 Development Tools as subcategory

HDC2080EVM Image

HDC2080EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

HDC2080EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Multiple Function Sensor Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Humidity, Temperature Sensor
  • Tool Is For Evaluation Of: HDC2080
  • Operating Supply Voltage: 3.3 V
  • Series: HDC2080
  • Brand: Texas Instruments
  • Interface Type: USB
  • Product Type: Multiple Function Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

HDC2080EVM

HDC2080EVM Specifications

HDC2080EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Humidity, Temperature Sensor.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 3.3 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed USB

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Multiple Function Sensor Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

58 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top