DS125BR820EVM

Mfr. #: DS125BR820EVM
Produttore: Texas Instruments
Descrizione: Interface Development Tools DS125BR820EVM
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: DS125BR820EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DS125BR820EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Repeater type. Texas Instruments is a trusted brand for quality electronics Compatible with DS125BR820NJY. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. 2.5 V, 3.3 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

DS125BR820EVM Image

DS125BR820EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DS125BR820EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Repeater
  • Tool Is For Evaluation Of: DS125BR820
  • Description/Function: 12.5 Gbps 8-channel repeater with equalization evaluation module
  • Series: DS125BR820
  • Brand: Texas Instruments
  • For Use With: DS125BR820NJY
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Operating Supply Voltage: 2.5 V, 3.3 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DS125BR820EVM

DS125BR820EVM Specifications

DS125BR820EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Repeater

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed DS125BR820NJY

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 85 C.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 2.5 V, 3.3 V.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Interface Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top