DS125BR111EVM

Mfr. #: DS125BR111EVM
Produttore: Texas Instruments
Descrizione: Interface Development Tools DS125BR111EVM
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: DS125BR111EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DS125BR111EVM Overview

This product is manufactured by Texas Instruments. Evaluation Kits This device belongs to the SMA type. Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Interface Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.002324 oz of Unit Weight

DS125BR111EVM Image

DS125BR111EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DS125BR111EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: Y
  • Product: Evaluation Kits
  • Type: SMA
  • Tool Is For Evaluation Of: DS125BR111
  • Packaging: Bulk
  • Description/Function: 10 GbE, PCIe, SAS/SATA evaluation kit
  • Series: DS125BR111
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.002324 oz

DS125BR111EVM

DS125BR111EVM Specifications

DS125BR111EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Kits.

  • A: What is the Type of the product?

    Q: The Type of the product is SMA.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 85 C.

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is - 40 C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Interface Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.002324 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top