DRV8432EVM

Mfr. #: DRV8432EVM
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools DRV8432 Eval Mod
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: DRV8432EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8432EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Motor / Motion Controllers & Drivers type. 12 V Input Voltage Output Voltage is 0 V to 52.5 V Output current: 14 A Texas Instruments is a trusted brand for quality electronics Compatible with DRV8432. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

DRV8432EVM Image

DRV8432EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8432EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: Motor / Motion Controllers & Drivers
  • Tool Is For Evaluation Of: DRV8432
  • Input Voltage: 12 V
  • Output Voltage: 0 V to 52.5 V
  • Description/Function: Dual full-bridge PWM motor driver
  • Output Current: 14 A
  • Series: DRV8432
  • Brand: Texas Instruments
  • For Use With: DRV8432
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DRV8432EVM

DRV8432EVM Specifications

DRV8432EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Motor / Motion Controllers & Drivers.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 12 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 0 V to 52.5 V

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 14 A

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is DRV8432.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top