DRV-ACC16-EVM

Mfr. #: DRV-ACC16-EVM
Produttore: Texas Instruments
Descrizione: Acceleration Sensor Development Tools DRV-ACC16-EVM
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: DRV-ACC16-EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV-ACC16-EVM Overview

This product is manufactured by Texas Instruments. Evaluation Kits This device belongs to the Accelerometer Sensor type. 3.5 V to 5.5 V operating supply voltage range Dimensions of 290 mm x 15 mm Acceleration of 16 g force Texas Instruments is a trusted brand for quality electronics Interface Type: Analog Three sensing axes: Triple Axis The product can operate at a maximum temperature of + 70 C. The minimum operating temperature of this product is - 25 C. Acceleration Sensor Development Tools product type 1 of 100 Development Tools as subcategory

DRV-ACC16-EVM Image

DRV-ACC16-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV-ACC16-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Acceleration Sensor Development Tools
  • RoHS: Y
  • Product: Evaluation Kits
  • Type: Accelerometer Sensor
  • Operating Supply Voltage: 3.5 V to 5.5 V
  • Description/Function: Haptic accelerometer measurement tool
  • Dimensions: 290 mm x 15 mm
  • Acceleration: 16 g
  • Brand: Texas Instruments
  • Interface Type: Analog
  • Sensing Axis: Triple Axis
  • Maximum Operating Temperature: + 70 C
  • Minimum Operating Temperature: - 25 C
  • Product Type: Acceleration Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DRV-ACC16-EVM

DRV-ACC16-EVM Specifications

DRV-ACC16-EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Kits

  • A: What is the Type of the product?

    Q: The Type of the product is Accelerometer Sensor.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 3.5 V to 5.5 V

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 290 mm x 15 mm.

  • A: At what frequency does the Acceleration?

    Q: The product Acceleration is 16 g.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is Analog.

  • A: Is the cutoff frequency of the product Sensing Axis?

    Q: Yes, the product's Sensing Axis is indeed Triple Axis

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 70 C.

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is - 25 C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Acceleration Sensor Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top