DLPDLCR3310EVM

Mfr. #: DLPDLCR3310EVM
Produttore: Texas Instruments
Descrizione: Display Development Tools DLP LIGHTCRAFTER DISPLAY 3310 EVM
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: DLPDLCR3310EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DLPDLCR3310EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules 3.3 V, 5 V operating supply voltage range Interface Type: I2C, SPI, USB Texas Instruments is a trusted brand for quality electronics Display Development Tools product type 1 of 100 Development Tools as subcategory The product's DLP is Blue Gecko.

DLPDLCR3310EVM Image

DLPDLCR3310EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DLPDLCR3310EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Display Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Tool Is For Evaluation Of: DLP3310
  • Operating Supply Voltage: 3.3 V, 5 V
  • Interface Type: I2C, SPI, USB
  • Series: DLP3310
  • Brand: Texas Instruments
  • Product Type: Display Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: DLP

DLPDLCR3310EVM

DLPDLCR3310EVM Specifications

DLPDLCR3310EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 3.3 V, 5 V.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed I2C, SPI, USB

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Display Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Tradename?

    Q: The product Tradename is DLP.

12 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top