DLPDLCR2010EVM

Mfr. #: DLPDLCR2010EVM
Produttore: Texas Instruments
Descrizione: Display Development Tools DLP LightCrafter Display 2010 EVM
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: DLPDLCR2010EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DLPDLCR2010EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules 5 V operating supply voltage range Interface Type: Audio, HDMI, I2C, JTAG, USB Texas Instruments is a trusted brand for quality electronics Display Development Tools product type 1 of 100 Development Tools as subcategory The product's DLP is Blue Gecko. 1. 1.247 lbs of Unit Weight

DLPDLCR2010EVM Image

DLPDLCR2010EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DLPDLCR2010EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Display Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Tool Is For Evaluation Of: DLP2010
  • Operating Supply Voltage: 5 V
  • Interface Type: Audio, HDMI, I2C, JTAG, USB
  • Description/Function: DLP LightCrafter display 2010 evaluation module
  • Series: DLPDLCR2010
  • Brand: Texas Instruments
  • Product Type: Display Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: DLP
  • Unit Weight: 1.247 lbs

DLPDLCR2010EVM

DLPDLCR2010EVM Specifications

DLPDLCR2010EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 5 V.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is Audio, HDMI, I2C, JTAG, USB.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Display Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Tradename?

    Q: The product Tradename is DLP.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 1.247 lbs.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top