CDCLVD2102EVM

Mfr. #: CDCLVD2102EVM
Produttore: Texas Instruments
Descrizione: Clock & Timer Development Tools CDCLVD2102EVM
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: CDCLVD2102EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCLVD2102EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Clock Buffers type. Frequency range: 200 MHz, 800 MHz Texas Instruments is a trusted brand for quality electronics The minimum operating temperature of this product is - 30 C. 2.5 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

CDCLVD2102EVM Image

CDCLVD2102EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCLVD2102EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: Clock Buffers
  • Tool Is For Evaluation Of: CDCLVD2102
  • Frequency: 200 MHz, 800 MHz
  • Series: CDCLVD2102
  • Brand: Texas Instruments
  • Minimum Operating Temperature: - 30 C
  • Operating Supply Voltage: 2.5 V
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

CDCLVD2102EVM

CDCLVD2102EVM Specifications

CDCLVD2102EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Clock Buffers

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 200 MHz, 800 MHz.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is - 30 C.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 2.5 V.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Clock & Timer Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top