CDCE421EVM

Mfr. #: CDCE421EVM
Produttore: Texas Instruments
Descrizione: Clock & Timer Development Tools CDCE421 Evaluation Module
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: CDCE421EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCE421EVM Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

CDCE421EVM Image

CDCE421EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCE421EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: N
  • Brand: Texas Instruments
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

CDCE421EVM

CDCE421EVM Specifications

CDCE421EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Clock & Timer Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top