CDC7005-EVM

Mfr. #: CDC7005-EVM
Produttore: Texas Instruments
Descrizione: Clock & Timer Development Tools CDC7005 Eval Mod
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: CDC7005-EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDC7005-EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Clock Synchronizers type. Frequency range: 800 MHz Texas Instruments is a trusted brand for quality electronics Interface Type: SPI 3.3 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

CDC7005-EVM Image

CDC7005-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDC7005-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Clock Synchronizers
  • Tool Is For Evaluation Of: CDC7005
  • Frequency: 800 MHz
  • Series: CDC7005
  • Brand: Texas Instruments
  • Interface Type: SPI
  • Operating Supply Voltage: 3.3 V
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

CDC7005-EVM

CDC7005-EVM Specifications

CDC7005-EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Clock Synchronizers.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 800 MHz.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is SPI.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 3.3 V.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Clock & Timer Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top