BQ35100EVM-795

Mfr. #: BQ35100EVM-795
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools BQ35100EVM-795
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: BQ35100EVM-795 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ35100EVM-795 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 15 V Input Voltage Output current: 750 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.158643 oz of Unit Weight

BQ35100EVM-795 Image

BQ35100EVM-795

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ35100EVM-795 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ35100
  • Input Voltage: 15 V
  • Output Current: 750 mA
  • Series: BQ35100
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.158643 oz

BQ35100EVM-795

BQ35100EVM-795 Specifications

BQ35100EVM-795 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Battery Management.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 15 V

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 750 mA.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.158643 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top