BQ2980EVM-883

Mfr. #: BQ2980EVM-883
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools BQ2980EVM-883
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: BQ2980EVM-883 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ2980EVM-883 Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ2980EVM-883 Image

BQ2980EVM-883

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ2980EVM-883 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • Series: BQ2980
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ2980EVM-883

BQ2980EVM-883 Specifications

BQ2980EVM-883 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top