BQ24747EVM

Mfr. #: BQ24747EVM
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools Eval Mod for BQ24747
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: BQ24747EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ24747EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Battery Management type. Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ24747EVM Image

BQ24747EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24747EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Boards
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ24747
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ24747EVM

BQ24747EVM Specifications

BQ24747EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Battery Management.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top