BQ24212EVM-678

Mfr. #: BQ24212EVM-678
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools BQ24212EVM-678
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: BQ24212EVM-678 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ24212EVM-678 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 7.3 V Input Voltage Output Voltage is 4.2 V Output current: 800 mA Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is 0 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ24212EVM-678 Image

BQ24212EVM-678

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24212EVM-678 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ24212
  • Input Voltage: 7.3 V
  • Output Voltage: 4.2 V
  • Description/Function: Single input, single cell, Li-Ion battery solar charger
  • Output Current: 800 mA
  • Series: BQ24212
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: 0 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ24212EVM-678

BQ24212EVM-678 Specifications

BQ24212EVM-678 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Battery Management

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 7.3 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 4.2 V

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 800 mA

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 125 C.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed 0 C

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top