BQ24192EVM-021

Mfr. #: BQ24192EVM-021
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools BQ24192 EVAL MOD
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: BQ24192EVM-021 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ24192EVM-021 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 3.9 V to 17 V Input Voltage Output Voltage is 3.7 V Output current: 4 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ24192EVM-021 Image

BQ24192EVM-021

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24192EVM-021 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ24192
  • Input Voltage: 3.9 V to 17 V
  • Output Voltage: 3.7 V
  • Output Current: 4 A
  • Series: BQ24196
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ24192EVM-021

BQ24192EVM-021 Specifications

BQ24192EVM-021 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Battery Management.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 3.9 V to 17 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 3.7 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 4 A

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top