| Mfr. #: | BQ24157EVM-697 |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | Power Management IC Development Tools BQ24157 EVAL MOD |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | BQ24157EVM-697 Scheda dati |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 5 V Input Voltage Texas Instruments is a trusted brand for quality electronics Interface Type: I2C Compatible with BQ24157. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24157EVM-697 Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Battery Management
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 5 V.
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: What is the Interface Type of the product?
Q: The Interface Type of the product is I2C.
A: Is the cutoff frequency of the product For Use With?
Q: Yes, the product's For Use With is indeed BQ24157
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.