Product Details
BQ24155EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 4 V to 6 V Input Voltage Output Voltage is 4.44 V Output current: 1.25 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is 0 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ24155EVM Image

BQ24155EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24155EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ24155
  • Input Voltage: 4 V to 6 V
  • Output Voltage: 4.44 V
  • Output Current: 1.25 A
  • Series: BQ24155
  • Brand: Texas Instruments
  • Interface Type: I2C
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: 0 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ24155EVM

BQ24155EVM Specifications

BQ24155EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Battery Management.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 4 V to 6 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 4.44 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 1.25 A

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is I2C.

  • A: Is the cutoff frequency of the product Maximum Operating Temperature?

    Q: Yes, the product's Maximum Operating Temperature is indeed + 125 C

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is 0 C.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.