BQ24070EVM

Mfr. #: BQ24070EVM
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools bq24070 Eval Mod
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: BQ24070EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ24070EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Battery Management type. 5 V Input Voltage Output Voltage is 4.2 V Dimensions of 58.4 mm x 45.5 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 6.363423 oz of Unit Weight

BQ24070EVM Image

BQ24070EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24070EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ24070
  • Input Voltage: 5 V
  • Output Voltage: 4.2 V
  • Dimensions: 58.4 mm x 45.5 mm
  • Series: BQ24070
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 6.363423 oz

BQ24070EVM

BQ24070EVM Specifications

BQ24070EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is Battery Management.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 5 V

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 4.2 V.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 58.4 mm x 45.5 mm.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 6.363423 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top