AMC1300EVM

Mfr. #: AMC1300EVM
Produttore: Texas Instruments
Descrizione: Amplifier IC Development Tools 250MV REINFORCED ISOLATION AMPLIFIER EVM
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: AMC1300EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AMC1300EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Isolation Amplifiers type. 2.7 V to 5.5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Amplifier IC Development Tools product type 1 of 100 Development Tools as subcategory

AMC1300EVM Image

AMC1300EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AMC1300EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Amplifier IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Isolation Amplifiers
  • Tool Is For Evaluation Of: AMC1300
  • Operating Supply Voltage: 2.7 V to 5.5 V
  • Series: AMC1300
  • Brand: Texas Instruments
  • Product Type: Amplifier IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

AMC1300EVM

AMC1300EVM Specifications

AMC1300EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Isolation Amplifiers.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 2.7 V to 5.5 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Amplifier IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

12 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top