| Mfr. #: | AFE8406EVM |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | RF Development Tools AFE8406 Eval Dght Bd |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | AFE8406EVM Scheda dati |


This product is manufactured by Texas Instruments. Development Kits 1.5 V to 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics RF Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE8406EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Development Kits.
A: At what frequency does the Operating Supply Voltage?
Q: The product Operating Supply Voltage is 1.5 V to 3.3 V.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: What is the Product Type of the product?
Q: The Product Type of the product is RF Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.