| Mfr. #: | ADS9110EVM-PDK |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | Data Conversion IC Development Tools ADS9110EVM-PDK |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | ADS9110EVM-PDK Scheda dati |


This product is manufactured by Texas Instruments. Demonstration Kits This device belongs to the ADC type. 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, SPI, USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS9110EVM-PDK Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Demonstration Kits.
A: What is the Type of the product?
Q: The Type of the product is ADC.
A: Is the cutoff frequency of the product Operating Supply Voltage?
Q: Yes, the product's Operating Supply Voltage is indeed 3.3 V
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: At what frequency does the Interface Type?
Q: The product Interface Type is I2C, SPI, USB.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.