ADS8353EVM-PDK

Mfr. #: ADS8353EVM-PDK
Produttore: Texas Instruments
Descrizione: Data Conversion IC Development Tools ADS8353 Perf Demo Kit
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADS8353EVM-PDK Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8353EVM-PDK Overview

This product is manufactured by Texas Instruments. Demonstration Kits This device belongs to the ADC type. Texas Instruments is a trusted brand for quality electronics Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS8353EVM-PDK Image

ADS8353EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8353EVM-PDK Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Demonstration Kits
  • Type: ADC
  • Tool Is For Evaluation Of: ADS8353
  • Series: ADS8353
  • Brand: Texas Instruments
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS8353EVM-PDK

ADS8353EVM-PDK Specifications

ADS8353EVM-PDK FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Demonstration Kits.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top