ADS7049-Q1EVM-PDK

Mfr. #: ADS7049-Q1EVM-PDK
Produttore: Texas Instruments
Descrizione: Data Conversion IC Development Tools ADS7049-Q1 Evaluation Module
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADS7049-Q1EVM-PDK Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7049-Q1EVM-PDK Overview

This product is manufactured by Texas Instruments. Demonstration Kits This device belongs to the ADC type. 3.3 V operating supply voltage range The AEC-Q100 Qualification Texas Instruments is a trusted brand for quality electronics Interface Type: USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS7049-Q1EVM-PDK Image

ADS7049-Q1EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7049-Q1EVM-PDK Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Demonstration Kits
  • Type: ADC
  • Tool Is For Evaluation Of: ADS7049-Q1
  • Operating Supply Voltage: 3.3 V
  • Qualification: AEC-Q100
  • Description/Function: ADS7049-Q1 evaluation module performance demostration kit
  • Series: ADS7049-Q1
  • Brand: Texas Instruments
  • Interface Type: USB
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS7049-Q1EVM-PDK

ADS7049-Q1EVM-PDK Specifications

ADS7049-Q1EVM-PDK FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Demonstration Kits.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 3.3 V.

  • A: Is the cutoff frequency of the product Qualification?

    Q: Yes, the product's Qualification is indeed AEC-Q100

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top