ADS5403EVM

Mfr. #: ADS5403EVM
Produttore: Texas Instruments
Descrizione: Data Conversion IC Development Tools ADS5403EVM
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADS5403EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5403EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SMA connector Compatible with ADS540x, ADS54T0x. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS5403EVM Image

ADS5403EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5403EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADS540x, ADS54T0x
  • Operating Supply Voltage: 5 V
  • Description/Function: Provides a platform for evaluating the ADS540x or ADS54T0x
  • Series: ADS5403
  • Brand: Texas Instruments
  • Interface Type: SMA connector
  • For Use With: ADS540x, ADS54T0x
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS5403EVM

ADS5403EVM Specifications

ADS5403EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is SMA connector.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is ADS540x, ADS54T0x.

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 85 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top