ADS42JB69EVM

Mfr. #: ADS42JB69EVM
Produttore: Texas Instruments
Descrizione: Data Conversion IC Development Tools ADS42JB69EVM
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADS42JB69EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS42JB69EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Compatible with ADS42JB69. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS42JB69EVM Image

ADS42JB69EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS42JB69EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADS42JB69
  • Operating Supply Voltage: 5 V
  • Series: ADS42JB69
  • Brand: Texas Instruments
  • For Use With: ADS42JB69
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS42JB69EVM

ADS42JB69EVM Specifications

ADS42JB69EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 5 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed ADS42JB69

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top