ADS4245EVM

Mfr. #: ADS4245EVM
Produttore: Texas Instruments
Descrizione: Data Conversion IC Development Tools ADS4245 Eval Mod
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADS4245EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS4245EVM Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS4245EVM Image

ADS4245EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS4245EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Series: ADS4245
  • Brand: Texas Instruments
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS4245EVM

ADS4245EVM Specifications

ADS4245EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top