ADS1263EVM-PDK

Mfr. #: ADS1263EVM-PDK
Produttore: Texas Instruments
Descrizione: Data Conversion IC Development Tools ADS1263 Performance Eval Kit
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADS1263EVM-PDK Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS1263EVM-PDK Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 3.3 V, 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SPI, USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 11.534586 oz of Unit Weight

ADS1263EVM-PDK Image

ADS1263EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS1263EVM-PDK Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADS1263
  • Operating Supply Voltage: 3.3 V, 5 V
  • Description/Function: Evaluation module for the ADS1263 ADC
  • Series: ADS1263
  • Brand: Texas Instruments
  • Interface Type: SPI, USB
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 11.534586 oz

ADS1263EVM-PDK

ADS1263EVM-PDK Specifications

ADS1263EVM-PDK FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 3.3 V, 5 V

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed SPI, USB

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 11.534586 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top