| Mfr. #: | ADC3244EVM |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | Data Conversion IC Development Tools ADC3244 Eval Module |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | ADC3244EVM Scheda dati |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 1.8 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: Serial Compatible with ADC3244. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.138035 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC3244EVM Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed ADC
A: At what frequency does the Operating Supply Voltage?
Q: The product Operating Supply Voltage is 1.8 V.
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: Is the cutoff frequency of the product Interface Type?
Q: Yes, the product's Interface Type is indeed Serial
A: Is the cutoff frequency of the product For Use With?
Q: Yes, the product's For Use With is indeed ADC3244
A: What is the Product Type of the product?
Q: The Product Type of the product is Data Conversion IC Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: Is the cutoff frequency of the product Unit Weight?
Q: Yes, the product's Unit Weight is indeed 0.138035 oz